Q: Do I need a permit?

A: This document details your typical permit requirements.  All projects are different in nature so if you have any questions, please feel free to contact the Planning and Development Services Department.

Q: Do I need an architect

A: Please see the Architect Requirement flow chart

Q: How long does it take to get a permit?

A: There are many factors that can change the time it takes to receive a permit.  The most important is having all of the documentation required for the project.  This helps us not have to go back and forth waiting on documents before we start the plan review.  Standard plan review time for residential is 10 business days, and 20 business days for commercial.

Please see the submittal requirements.

 

Q: Do I need an engineer?

A: If you are doing any work that will be part of the lateral force resisting system for the structure you will need windstorm design and engineering. This is due to the fact we are located in a windstorm design region.

Q: Do I need a WPI-1?

A: If you are doing work that is not exempt from inspection by a windstorm inspector.  Please see the “Home repairs that don’t require a windstorm inspection” guide

Close Search Window
The City of Kingsville is working with Magellan Advisors on a Broadband Feasibility Study, with the goal of ensuring every resident and business across the City of Kingsville has access to high-speed broadband internet services.

To help with this effort, we need to collect information concerning internet access, speed availability, affordability, and reliability across the City of Kingsville.

To help in this effort, we ask that you take our short broadband survey. 


While completing the survey we ask that you
  • Be directly connected to your home/business network
  • If possible, take the survey during peak use periods in the evening (between 6pm-9pm)
  • Answer all questions to the best of your ability (estimates are fine)
Take Survey
close-link